mobile background

Railway / Bridge

Infrastructure
Railway / Bridge
Infrastructure

RAILWAY / BRIDGE



 • Incheon, Korea

 • Oct 2004 to Oct 2009

 • Total length 12.343㎞, Width 31.4m, Bridge section

   length 11.658㎞, Center span 800m


 • Incheon, Korea

 • Dec 2021 to Mar 2026

 • Length 2.6km(Including Cable-Stayed Bridge 0.8km), 

   Breadth 29m, 1 intersection


 • Hwaseong to Ansan, Korea

 • Mar 2008 to Mar 2013

 • Total length 3.3㎞(super long-span bridge 2.76㎞), 

   Width 23.4m(4 lane)


 • Daejeon, Korea

 • Jul 2008 to Jun 2010

 • Total length 1.827㎞, Road width 28.4m, 

   Bridge width 30m, Total 3 Bridges length 730m


 • Ulsan, Korea

 • Jun 2010 to May 2015

 • Suspension bridge length 2.97㎞, 

   Tunnel length 1.55㎞


 • Jecheon, Korea

 • Dec 1996 to Oct 2001

 • Total length 450m, Width 11m, 

   Highest bridge pier 60m, Center span 180m


 • Gimpo to Seoul, Korea

 • Jun 2014 to Jun 2018

 • Total length 6.7km, Tunnel length 6.5km, 

   2 Subway stations


 • Seoul, Korea

 • Aug 2016 to Jul 2022

 • Tunnel length 536.44m, 1 subway station

   (4 basement)


 • Seoul, Korea

 • Feb 2017 to May 2022

 • Total length 2.689km, 3 subway stations


 • Dongducheon-Yeoncheon, Korea

 • Oct 2014 to Dec 2024

 • Total length 9.15km, Tunnel length 2.795km, 

   2 bridges, 2 stations

RAILWAY / BRIDGE



 • Incheon, Korea

 • Oct 2004 to Oct 2009

 • Total length 12.343㎞, Width 31.4m, Bridge section length 11.658㎞, Center span 800m


 • Incheon, Korea

 • Dec 2021 to Mar 2026

 • Length 2.6km(Including Cable-Stayed Bridge 0.8km), 

   Breadth 29m, 1 intersection


 • Hwaseong to Ansan, Korea

 • Mar 2008 to Mar 2013

 • Total length 3.3㎞(super long-span bridge 2.76㎞), Width 23.4m(4 lane)


 • Daejeon, Korea

 • Jul 2008 to Jun 2010

 • Total length 1.827㎞, Road width 28.4m, Bridge width 30m, Total 3 Bridges length 730m



 • Ulsan, Korea

 • Jun 2010 to May 2015

 • Suspension bridge length 2.97㎞, Tunnel length 1.55㎞

 • Jecheon, Korea

 • Dec 1996 to Oct 2001

 • Total length 450m, Width 11m, Highest bridge pier 60m, Center span 180m


 • Gimpo to Seoul, Korea

 • Jun 2014 to Jun 2018

 • Total length 6.7km, Tunnel length 6.5km, 2 Subway stations


 • Seoul, Korea

 • Aug 2016 to Jul 2022

 • Tunnel length 536.44m, 1 subway station(4 basement)


• Seoul, Korea

 • Feb 2017 to May 2022

 • Total length 2.689km, 3 subway stations


 • Dongducheon-Yeoncheon, Korea

 • Oct 2014 to Dec 2024

 • Total length 9.15km, Tunnel length 2.795km, 2 bridges, 2 stations


04541, Hanwha Building, 86 Cheonggyecheon-ro, Jung-gu, Seoul, Korea


04541, Hanwha Building, 86 Cheonggyecheon-ro, Jung-gu, Seoul, Korea

TEL : + 82.2.729.2255